London bathroom renovation cost guide

Bathroom Renovation Cost in London: 2026 Guide


Understand what a bathroom renovation may cost in London, what a standard quotation can include and how the room condition, layout, products and installation details affect the final budget.

A small, standard bathroom renovation with the existing layout broadly retained typically costs £7,000–£10,000 excluding VAT. This is a budgeting guide rather than a quotation.

Cost information reviewed July 2026. The final price depends on the inspected condition, measured work, selected products and agreed project scope.

Completed bathroom renovation in a London home
Compare the complete scope A small bathroom is not necessarily a simple project Plumbing, electrical work, preparation, waterproofing, tiling, sanitaryware installation and finishing all contribute to the cost.
01 · GUIDE BUDGET £7,000–£10,000 Small standard bathroom with the existing layout broadly retained. Prices exclude VAT.
02 · TYPICAL PROGRAMME Approximately 10 – 15 working days A practical guide for a standard complete bathroom renovation. Simpler replacements may take less time, while layout changes, specialist work or concealed repairs may extend the programme.
03 · FINAL PRICE Based on the confirmed scope Layout changes, premium products and concealed repair work require a project-specific quotation.

London bathroom renovation prices

How much does a bathroom renovation cost in London?

A small, standard bathroom renovation with the existing layout broadly retained typically costs £7,000–£10,000 excluding VAT.

This is an early budgeting range—not a fixed price. The final quotation depends on the condition discovered during inspection, measured tiling area, chosen products, access and the amount of plumbing, electrical and preparation work required.

Quick answer Allow £7,000–£10,000 excluding VAT For a small standard bathroom using standard products and finishes, with the principal plumbing positions broadly retained.

Bathroom cost categories

Guide reviewed July 2026
Typical guide budget

Small standard bathroom renovation

£7,000–£10,000 Excluding VAT

An indicative complete-renovation range where the layout is broadly retained and standard products and finishes are used. It can cover strip-out, waste removal, standard building materials, sanitaryware, tiling, basic electrical work, plumbing, preparation, decoration and final finishing.

Alternative pricing model

Labour-only bathroom fitting

Quotation Based on the confirmed work

Labour-only means that the customer supplies the agreed customer-facing bathroom products and finishes. The written quotation will separately confirm which trades, building materials, preparation, waste removal and finishing work are included.

Changed or complex scope

Layout changes and specialist work

Project-specific Site visit and quotation required

Moving a toilet, changing drainage routes, major rewiring, complicated joinery, wet-room construction, premium products or substantial concealed repairs can move the project outside the standard guide range.

Genuine completed project

Chiswick bathroom renovation

£10,300 Excluding VAT · completed in 13 working days

An approximately 2m × 2.5m bathroom in Chiswick, West London. The project used medium-cost sanitaryware and tiles, included toilet relocation and required repairs after mould and damaged areas were discovered behind the old bath.

VAT position Published project prices exclude VAT

Project totals and completed-project figures on this guide exclude VAT. Customer-facing product allowances are shown including VAT. The written quotation will show the applicable VAT calculation clearly.

Customer contingency Keep a separate contingency for concealed defects or requested changes

The appropriate amount depends on the property’s condition, the extent of strip-out and how much of the existing construction is concealed. This contingency is separate from the Growchance quotation unless specifically stated.

Compare the complete scope—not only the total: a lower quotation may exclude sanitaryware, tiles, waste removal, waterproofing, electrical work, preparation or decoration. Growchance confirms the agreed inclusions, exclusions and allowances in the written quotation. For the complete service scope, visit Bathroom Renovation London.

Understanding the quotation

What is included in a standard bathroom renovation?

The £7,000–£10,000 excluding VAT guide is intended for a small standard bathroom where the principal plumbing positions are broadly retained and the room does not require substantial structural or concealed repair work.

The price is not simply for fitting a bath, basin and toilet. A complete renovation normally involves several connected trades, preparation stages and finishing tasks within one moisture-sensitive room.

Important The exact written quotation controls the final scope Every bathroom is inspected and measured before the work, products, allowances, exclusions and price are confirmed.

Typical complete-renovation scope

Subject to inspection and written quotation
01

Strip-out and waste removal

Careful removal of the existing sanitaryware, accessible finishes and agreed bathroom fittings, followed by the removal of normal renovation waste from the property.

02

Plumbing installation

Standard plumbing work for the agreed bath or shower, basin and toilet where the main service and drainage positions remain broadly unchanged.

03

Electrical work

Agreed standard electrical work connected with the bathroom renovation, such as lighting, ventilation and suitable bathroom accessories, subject to the inspected electrical installation.

04

Preparation and waterproofing

Standard preparation of the agreed backgrounds and appropriate waterproofing to specified wet areas before finishes are installed. Damaged or unsuitable concealed backgrounds are assessed separately.

05

Tiling and floor finishing

Installation of the agreed wall tiles and floor finish using a straightforward layout. Intricate patterns, mosaics, natural stone or unusually complex cutting may require additional labour.

06

Sanitaryware installation

Installation of the agreed standard bath or shower arrangement, toilet, basin, taps and associated fittings included within the confirmed product schedule.

07

Standard building materials

Normal installation materials required for the agreed work, such as standard plumbing fittings, adhesives, grout, sealants and preparation materials, as specified in the quotation.

08

Decoration and final finishing

Agreed preparation and painting of the remaining bathroom surfaces, fitting of the specified accessories, sealing, adjustment and final finishing of the completed room.

Product allowances within the guide renovation scope

These allowances help define the budgeting range. They represent the maximum included material values for the relevant products and are stated including VAT. Products exceeding an allowance increase the final price by the agreed difference.

Sanitaryware allowance Up to £800 Including VAT

For the agreed standard sanitaryware package.

Wall and floor tile material Up to £20/m² Including VAT

Applied to the measured tiling area included in the quotation.

Flooring material allowance Up to £20/m² Including VAT

Applied where a separate agreed flooring product is used.

Mirror and lighting combined Up to £150 Including VAT

Combined product allowance for the agreed mirror and light fitting.

Example: if the selected tiles cost more than £20 per m² including VAT, the quotation is adjusted for the additional material cost across the measured tiling area. The allowance does not mean that every bathroom contains the same quantity of tiles or flooring.
Customer-supplied products

You may select or purchase your own products

Growchance can provide a labour-only quotation when the customer is supplying sanitaryware, tiles, flooring, lighting or accessories. Product details should be confirmed before the quotation because installation requirements can vary considerably.

Service information

Planning a complete bathroom renovation?

View the bathroom service page for more information about the renovation process, workmanship, related services and requesting a site visit.

View Bathroom Renovation London

Understanding price differences

What affects bathroom renovation cost?

Bathroom size matters, but it does not determine the price on its own. Two rooms with similar dimensions can require very different amounts of plumbing, preparation, tiling and installation work.

The biggest differences normally come from the layout, condition of the existing room, selected products and complexity of the required finish.

Key budgeting principle A small bathroom is not automatically a low-cost bathroom Compact rooms can still contain several plumbing connections, electrical work, detailed tiling and difficult working conditions.
01 Major cost factor

Changing the bathroom layout

Retaining the principal positions of the toilet, basin and bath or shower normally keeps the plumbing scope more straightforward. Relocating sanitaryware or changing drainage routes can require opening floors, altering water supplies and waste pipes, and completing additional preparation and making good.

02 May be concealed

Existing condition and hidden defects

Water damage, mould, leaking pipework, rotten timber, loose plaster or unsuitable walls and floors may only become fully visible after strip-out. Repairing these areas correctly adds labour and materials but protects the new bathroom from premature failure.

03 Finish-led difference

Tiling quantity and specification

Full-height tiling costs more than tiling only the principal wet areas. Large-format tiles, mosaics, natural stone, detailed patterns, feature borders, niches and complex layouts can require additional preparation, cutting and setting-out time.

04 Product-led difference

Sanitaryware and bathroom products

The cost changes when selected sanitaryware, tiles, flooring, mirrors, lighting or other products exceed the allowances stated in the quotation. Product choice may also affect installation: heavy, specialist or concealed products can require additional support, preparation and fitting time.

Other details that influence the quotation

These factors may appear smaller individually, but together they can change the amount of construction, coordination and finishing required. They should be assessed against the proposed design and the existing room.

05

Electrical work and heating

Additional lighting circuits, electric underfloor heating, heated mirrors, new extraction arrangements or remedial electrical work must be assessed and included in the confirmed electrical scope.

06

Wet-room or level-access construction

A level-access shower or wet room may require floor alterations, specialist drainage, falls to the outlet and a more extensive waterproofing system than a standard bath or shower-tray installation.

07

Concealed fittings, joinery and storage

Concealed cisterns, recessed valves, wall-hung fittings, bespoke vanity units, service voids and fitted storage can require support frames, additional carpentry, access arrangements and detailed finishing.

08

Access and logistics

Upper-floor access, parking restrictions, lift protection, communal-area rules, restricted working hours and difficult waste removal can affect the project programme and quotation.

Usually identifiable before work

Planned additions

These items arise from the proposed design or selected products and can normally be discussed and priced before the renovation begins.

  • Relocated sanitaryware
  • Premium or specialist products
  • Wet-room construction
  • Bespoke storage
  • Detailed tile layouts
  • Enhanced lighting or heating
Sometimes visible only after strip-out

Concealed remedial work

Some conditions are hidden behind sanitaryware, tiles, boxing, walls or floor finishes and cannot always be measured accurately during an initial visual inspection.

  • Water damage
  • Rotten timber
  • Hidden leaking pipework
  • Unsuitable walls or floors
  • Poor previous waterproofing
London-flat clarification

Confirm building-management requirements before work begins

Renovating a flat may require compliance with conditions set by the managing agent, freeholder or building management. These can include advance notification, contractor information, lift bookings, protection of communal areas, approved working hours and agreed waste-removal arrangements. Confirming these requirements early helps prevent avoidable delays and allows them to be considered within the project plan.

Changes and unforeseen work

Additional work should be agreed before it proceeds

Work outside the agreed scope should be explained, priced and approved in writing before it proceeds, except where immediate action is required to make the property safe.

Confirm the complete scope before comparing quotations

A lower headline figure may not include the same preparation, waterproofing, products, waste removal or finishing. Compare the complete written scope—not only the final number.

Request a Site Visit

Programme and labour

How long does a bathroom renovation take?

A straightforward small bathroom renovation will commonly require approximately two to three working weeks once work begins on site.

The actual programme depends on the existing condition, proposed layout, drying times, product availability and whether specialist construction or concealed repairs are required.

Typical working programme Allow around 10 – 15 working days for a standard bathroom This is a planning guide, not a fixed promise. The confirmed programme should be based on the inspected scope and selected products.
Lower-complexity project 7–10 days

Simple replacement

More achievable where the principal layout is retained, products are available, backgrounds are sound and the tiling and finishing scope is relatively straightforward.

Typical complete renovation 10 – 15 days

Standard bathroom project

A practical guide for strip-out, preparation, plumbing, waterproofing, tiling, installation and finishing where no major concealed problems are discovered.

Higher-complexity project 3+ weeks

Complex or specialist work

More time may be required for layout changes, wet-room construction, extensive repairs, bespoke joinery, specialist finishes or coordination with other renovation work.

Typical sequence

What happens during the renovation?

Bathroom work follows an organised sequence. Several stages depend on the preceding work being completed, inspected or allowed to dry before the next trade can proceed.

01
Protection and strip-out
Protect access routes, isolate services and remove the existing sanitaryware, finishes and unwanted fittings.
02
Repairs and first fix
Complete necessary background repairs, form the required layout and install concealed plumbing and electrical work.
03
Preparation and waterproofing
Prepare walls and floors, install suitable tile backgrounds and waterproof the agreed wet areas.
04
Tiling and finishes
Set out and install the selected wall and floor finishes, allowing for the required adhesive, grout and drying periods.
05
Final installation
Fit sanitaryware, furniture, controls, accessories and electrical fittings before testing, sealing and final completion.

What can extend the programme?

A realistic programme should allow for the confirmed specification and known construction work. Some delays can also arise from conditions or decisions outside the original scope.

01

Concealed defects

Leaks, damaged timber, unsuitable walls or defective hidden pipework may require remedial work before the installation continues.

02

Late product delivery

Missing or damaged sanitaryware, tiles and specialist fittings can interrupt dependent stages of the work.

03

Changes after work starts

Revising the layout, products or finish during construction may create additional ordering, preparation and installation work.

04

Specialist preparation

Wet rooms, complex tiling, bespoke joinery and significant floor or wall alterations naturally require a longer programme.

Programme and price

Why does the timescale affect the cost?

A longer programme is normally the result of additional labour, preparation or construction—not simply the number of calendar days for which the bathroom is unavailable.

Additional labour More preparation, detailed installation and finishing require more skilled working time.
Trade coordination Plumbing, electrical, carpentry, waterproofing and tiling stages must be organised in the correct sequence.
Remedial construction Repairing walls, floors, timber or concealed services adds measurable work before the visible installation begins.
Specialist details Wet rooms, niches, concealed fittings and bespoke features require more setting out and careful installation.

Plan the price and programme together

Growchance can inspect the existing bathroom, review the proposed design and provide a written scope, quotation and practical project programme.

Practical budget control

How can you reduce the cost of a bathroom renovation?

The safest way to reduce a bathroom renovation budget is to simplify the design and product specification while protecting the preparation, waterproofing and installation work on which the finished bathroom depends.

Cost control should begin before work starts. A confirmed layout, complete product schedule and clearly written scope help prevent late decisions, duplicate work and unnecessary variations.

Best starting point Keep the layout practical and decide the specification early Retaining suitable plumbing positions and choosing readily available products can reduce both labour and programme risk.
01

Retain the existing layout

Keeping the toilet, basin, bath and shower close to their existing positions can avoid extensive changes to water supplies, waste pipes, floors and boxing. This is particularly important when considering the toilet’s soil connection.

02

Choose standard-size products

Standard baths, shower trays, furniture and screens are normally easier to source and install than unusual sizes or bespoke products. Check that every chosen item fits the measured space before ordering.

03

Use feature tiles selectively

Premium tiles can be limited to a feature wall, shower area or defined section rather than every surface. Straightforward tile sizes and layouts can also reduce cutting, preparation and installation time.

04

Confirm products before work

Select and order sanitaryware, tiles, taps, furniture and specialist fittings early. Missing dimensions, incompatible products and late deliveries can interrupt the programme and create avoidable additional work.

05

Avoid late design changes

Changing positions, finishes or fittings after first-fix work has been completed may require finished work to be opened or repeated. Agree the layout, controls and installation details before construction begins.

06

Compare the complete scope

Compare quotations using the same work, products and allowances. A lower price may exclude preparation, waterproofing, waste removal, electrical work, decorating or other items required to complete the bathroom.

Where to adjust the budget

Reduce the specification before the essential work

Visible products and decorative details offer more flexibility than the concealed construction that protects the bathroom from leaks, movement and premature failure.

Sanitaryware range
Choose reliable standard products instead of premium designer ranges, unusual finishes or fittings that require specialist installation.
Decorative finishes
Simplify tile patterns, reduce specialist feature areas and avoid excessive niches, trims or bespoke decorative details.
Bespoke storage
Replace made-to-measure joinery with appropriately sized standard bathroom furniture where the room and design allow.
Layout complexity
Retain practical service positions and avoid unnecessary construction, drainage changes or concealed installation systems.
False economies to avoid

Where should you not cut costs?

Saving money on work that controls water, ventilation, electrical safety or the stability of the finished surfaces can result in leaks, mould, failed finishes and substantially greater repair costs later.

Waterproofing Wet areas need an appropriate preparation and waterproofing system suitable for the selected shower or bathing arrangement.
Plumbing Concealed supplies, waste connections and valves should be installed, supported and tested correctly before surfaces are closed.
Electrical work Bathroom electrical installation must account for the applicable zones, equipment suitability and required testing.
Background preparation Walls and floors must be sound, suitable and properly prepared before waterproofing, tiling and final finishes are installed.
Before requesting quotations

Prepare a realistic bathroom brief

Contractors can provide more useful and comparable quotations when the important design and product decisions are known. Your brief does not need to be complicated, but it should define what you expect the finished bathroom to include.

01 Define the layout Confirm whether fixtures will remain in place or whether plumbing and drainage positions must change.
02 Set product allowances Establish realistic budgets for sanitaryware, tiles, flooring, furniture, lighting and accessories.
03 List required features Identify heating, storage, extraction, lighting, niches and other features that must be included in the quotation.
04 Keep a contingency Retain part of the available budget for concealed repairs or other work that cannot be confirmed before strip-out.

Need help balancing the design and budget?

Growchance can inspect your bathroom, discuss practical ways to control the cost and prepare a written quotation based on the agreed renovation scope.

Comparing bathroom quotations

What should a bathroom renovation quotation include?

A useful bathroom renovation quotation should describe the complete agreed scope, identify important allowances and explain which products or services are included and excluded.

Comparing only the final totals can be misleading. Two quotations may appear to cover the same bathroom while including very different levels of preparation, waterproofing, electrical work, finishing and waste removal.

The essential rule Compare the scope—not only the final price A clear quotation allows you to understand what will be completed, what you must supply and how additional work will be handled.
Essential quotation details

Eight items to check before accepting

Every project is different, but the main work and commercial arrangements should be clear enough for you to understand what the quoted price is based on.

Defined scope of work The quotation should identify the bathroom, proposed layout and principal strip-out, preparation, installation and finishing work.
Labour and trade work Confirm which plumbing, electrical, carpentry, tiling, decorating and other skilled work is included.
Materials and products Establish which construction materials and customer-facing products are supplied by the contractor and which you must purchase.
Product allowances Where products remain unselected, the quotation should make any monetary allowances or provisional sums identifiable.
Waste removal Check whether demolition waste, packaging and unwanted bathroom fittings will be removed from the property.
Estimated programme The quotation or supporting information should give a practical indication of the expected on-site working period.
VAT position Confirm whether VAT applies and whether the displayed total includes it, so the amount being compared is clear.
Payment arrangements Deposits, staged payments and the final balance should correspond with identifiable project stages or agreed supply commitments.
Construction scope

Work that should be clearly addressed

  • Protection of access routes and working areas
  • Removal of existing sanitaryware and finishes
  • Plumbing and electrical first-fix work
  • Wall and floor preparation
  • Waterproofing of the agreed wet areas
  • Tiling, grouting, sealing and finishing
Items requiring confirmation

Common inclusions or exclusions to check

  • Sanitaryware, taps and shower equipment
  • Tiles, flooring and decorative finishes
  • Bathroom furniture, mirrors and accessories
  • Lighting, extraction and heating products
  • Skip, parking and waste-disposal charges
  • Repair of concealed defects discovered after strip-out
Like-for-like comparison

How should you compare bathroom quotations?

Review each quotation against the same design, specification and expected finish. If one contractor has allowed for substantially more preparation or more complete finishing, the totals are not directly comparable.

01 Use the same brief Give each contractor the same layout, product information and description of the finish you expect.
02 Check allowances A lower product allowance can make one quotation appear cheaper before the final products have been selected.
03 Identify exclusions Note any required work or products that are absent and calculate their likely effect on the complete budget.
04 Ask written questions Clarify uncertain items before accepting the quotation and retain the agreed answers with the project documents.
Warning signs

When a low quotation may not represent the final cost

A low starting price is not automatically poor value, but it should still explain how the complete bathroom will be delivered and what may increase the amount later.

Very limited description
A single total with little detail makes it difficult to establish which preparation, products and finishing work have been allowed for.
Important work omitted
Waterproofing, electrical work, extraction, preparation or disposal may still be required even when they are absent from the initial price.
Unclear allowances
Undefined provisional amounts can make it difficult to predict the final total once products and construction details are confirmed.
No variation process
The quotation should explain how additional work or customer-requested changes will be described, priced and approved.

Request a quotation based on the complete bathroom scope

Growchance can inspect your existing bathroom, discuss the proposed design and provide a written quotation explaining the planned work and relevant inclusions.

Real project and budget examples

Example Bathroom Renovation Budgets

Our completed Chiswick bathroom provides a genuine example of how specification and scope translate into cost. The additional scenarios provide illustrative budgeting guidance rather than fixed package prices.

Included in the £10,300 project

Chiswick Project Scope

  • Removal of the existing bathroom fittings and finishes
  • Plumbing alterations for the proposed bathroom arrangement
  • Electrical preparation and bathroom lighting installation
  • Wall and floor preparation before waterproofing and tiling
  • Installation of sanitaryware, brassware and bathroom furniture
  • Final sealing, decoration, testing and completion checks

Compare possible scopes

Two Further Budgeting Scenarios

These two examples are not completed Growchance projects or fixed quotations. They demonstrate how retaining an existing layout or choosing a more involved specification can affect the likely budget.

Scenario 01

Small Flat Bathroom

Illustrative

A straightforward renovation where the principal fixtures remain in broadly the same positions and the specification is practical.

  • Existing bathroom removed
  • Principal plumbing positions retained
  • Standard bath or shower arrangement
  • Practical sanitaryware and brassware
  • Straightforward ceramic tiling
  • Standard lighting and ventilation
Illustrative budget £7,000 – £10,000 Excluding VAT and subject to confirmation of the complete scope, existing condition and selected products.
Scenario 02

Higher-Specification Bathroom

Illustrative

A more involved renovation with layout alterations, premium products and installation details requiring additional labour and preparation.

  • Bathroom layout and services revised
  • Premium sanitaryware and brassware
  • Large-format or detailed tile installation
  • Concealed valves or wall-hung fittings
  • Built-in niche or bespoke storage
  • Enhanced lighting, heating and finishing
Illustrative budget £10,000 – £15,000+ Excluding VAT and subject to confirmation of the complete scope, existing condition and selected products.

Bathroom cost questions

Bathroom renovation cost FAQs

These answers cover common questions about bathroom renovation budgets, quotations, product costs and unexpected work in London properties.

Need an accurate figure? The property and proposed scope must be inspected Online guides are useful for planning, but a written quotation should reflect the room, layout, condition and selected specification.
Explore Bathroom Renovation London
01 How much does a bathroom renovation cost in London?

The cost depends on the bathroom’s size, existing condition, layout, required preparation and chosen specification. A straightforward replacement using practical products will normally cost less than a complete redesign involving relocated plumbing, specialist finishes or substantial concealed repairs.

The earlier pricing sections of this guide provide planning ranges, but an inspection is required before a project-specific quotation can be prepared.

02 Why do bathroom renovation quotations vary so much?

Quotations may be based on different levels of preparation, product supply, waterproofing, electrical work, waste removal and finishing. Some prices include a complete renovation scope, while others cover installation labour or selected work only.

Compare the written scope, allowances and exclusions before comparing the final totals.

03 Is it cheaper to keep the existing bathroom layout?

It often is. Retaining suitable positions for the toilet, basin, bath and shower can reduce changes to water supplies, waste pipes, flooring and boxing. The saving depends on whether the existing services are in suitable condition and can support the proposed products.

04 Are bathroom fixtures and tiles included in the quotation?

This depends on the agreed quotation. Sanitaryware, taps, shower equipment, tiles, furniture and accessories may be supplied by the contractor, supplied by the customer or covered by stated product allowances.

Every important product should be identified as included, excluded or subject to an allowance before the quotation is accepted.

05 Should I keep a contingency for bathroom renovation?

Yes. A contingency helps protect the project budget if strip-out reveals damaged floors, unsuitable walls, leaking pipework, poor previous alterations or other concealed problems that could not reasonably be confirmed beforehand.

The appropriate amount depends on the property’s age, visible condition and how much of the existing construction will be opened.

06 Can unexpected work increase the final bathroom cost?

Yes. Concealed water damage, rotten timber, unsuitable backgrounds, defective plumbing or unsafe electrical work may only become visible after the old bathroom has been removed.

Additional work should be explained and priced through an agreed variation process before it proceeds, except where immediate action is necessary to make the property safe.

07 How long does a typical bathroom renovation take?

The programme depends on the room, layout changes, preparation, waterproofing, tile installation, product availability and number of trades involved. Straightforward projects are normally quicker than renovations requiring extensive plumbing alterations, bespoke details or concealed repairs.

The expected working period should be confirmed after the design, products and complete construction scope are understood.

08 How can I obtain an accurate bathroom renovation quotation?

Prepare your preferred layout, product choices, required features and approximate budget before requesting a site visit. The contractor can then inspect the existing room, assess access and condition, discuss the specification and identify any information still required.

You can request a Growchance site visit to discuss your proposed bathroom renovation and receive a written quotation based on the agreed scope.

Discuss your bathroom renovation budget with Growchance

Arrange a site visit so we can inspect the room, understand your design and prepare a quotation for the complete agreed renovation scope.

Request a Site Visit

Plan your bathroom renovation

Request a bathroom renovation quotation.

Tell us about your existing bathroom and the work you are considering. We will review your enquiry, discuss the proposed scope and arrange a site visit where appropriate before preparing your written quotation.

Helpful details

London postcode, bathroom type, proposed work, approximate budget and preferred timescale.

Project information

Mention if you have photographs, measurements, layout ideas or preferred bathroom products available.

Bathroom costs depend on the room’s condition, layout, specification and complete agreed scope. A final quotation follows project discussion and, where appropriate, a site inspection.