Skip to content

LONDON RENOVATION BUDGET PLANNING

Renovation Cost Guides for London Homes.

Explore practical Growchance cost guides for full renovations, kitchens, bathrooms, extensions, loft conversions, structural work, flooring and finishing trades.

Cost ranges and calculator results provide initial planning guidance. Final scope and pricing depend on the property, specification and conditions found on site.

RENOVATION BUDGET MAP GUIDANCE READY

CHOOSE THE PART OF YOUR PROJECT TO PLAN

01 Whole property House, flat and coordinated renovation
02 Rooms Kitchens, bathrooms and specialist finishes
03 Structure Extensions, lofts and structural alterations
04 Finishes Flooring, plastering and decorating
Review Scope
Compare Allowances
Confirm VAT basis

ILLUSTRATIVE PLANNING PREVIEW

Guides organised by project Go directly to the work you are planning.
London-focused guidance Costs, scope and allowances explained in context.
Calculators where useful Estimate quantities or an initial planning range.

KITCHENS AND BATHROOMS

Plan the rooms with the most moving parts.

Kitchen and bathroom budgets depend on more than the visible products. Preparation, plumbing, electrics, ventilation, waterproofing and finishing can all affect the final scope.

Start with the complete room guide, then use the more focused guides where you need additional detail about a particular trade.

Use the complete-room guide for the overall budget.

The tiling and waterproofing guides explain individual parts of bathroom work. They should not be added mechanically to the complete bathroom range because some preparation and installation allowances may already be included.

STRUCTURAL WORK AND APPROVALS

Budget beyond the visible building work.

Structural alterations can involve more than demolition and installation. Engineering, temporary support, steelwork, inspections, Building Control and making-good may all affect the budget.

Use the dedicated guides below for load-bearing wall work and the focused Building Control notice fees covered by Growchance.

IMPORTANT BUDGET DISTINCTION
Approval fees are not the complete cost of a structural alteration.

Building Control fees, structural-engineer charges, construction work, steelwork, waste removal and final making-good are separate cost elements. Use the load-bearing wall guide for the wider project budget and the Building Control page for its narrower fee purpose.

FLOORING COST GUIDES

Compare the floor before choosing the finish.

Flooring costs depend on the selected material, installation pattern, subfloor condition, preparation and the shape of the rooms.

Use the broad guide for an initial comparison, then open the material-specific guide for more detailed fitting and preparation information.

WALLS, CEILINGS AND FINISHES

Plan the preparation as well as the finish.

Painting and plastering prices depend heavily on the condition of the existing surfaces. A room that appears similar in size can require a very different amount of preparation.

Use each guide for its own trade and avoid assuming that major plaster repairs are automatically included in standard decorating.

01 Painting and decorating

Painting and Decorating Cost Guide

Review residential interior and exterior painting costs, including standard preparation, walls, ceilings, woodwork, doors, windows and the factors that affect a decorating quotation.

Room and property-size cost planning Walls, ceilings, skirting and architraves Surface condition and preparation allowances
Explore Painting and Decorating Costs
02 Plastering

Plastering Cost Guide

Compare plastering costs for walls, ceilings, skimming, preparation, plasterboard work and more extensive repair requirements in London homes.

Wall and ceiling skimming Preparation and damaged-surface allowances Plasterboard, repairs and additional work
Explore Plastering Costs
HOW THE TRADES CONNECT
Plastering creates the surface. Decorating completes the finish.

Minor filling and normal surface preparation may form part of decorating work, but full skimming, damaged plaster replacement, plasterboarding and major repairs should be assessed separately. Check the inclusions in the relevant guide before combining budgets.

FREE PROJECT CALCULATORS

Turn measurements into a first planning estimate.

Use the Growchance calculators to estimate quantities, materials or an initial labour range for selected renovation and finishing work.

You can review the initial result before deciding whether to send the project details to Growchance.

Calculator results are initial planning estimates.

Measurements, preparation, product suitability, access, hidden conditions and the final scope must be confirmed before materials are ordered or a quotation is agreed. A calculator result is not a fixed quotation or contract.

USING THE GUIDANCE

Read the range before relying on the number.

A useful renovation budget is based on more than a headline price. Check what the guide includes, which assumptions were used and whether the figures include VAT.

Treat every published range as a starting point for planning rather than a quotation.

01 Select the owner

Choose the guide matching the main project.

Use the whole-property guide for a coordinated renovation and a specialist guide for an individual room, trade or structural task. Avoid combining unrelated headline ranges.

02 Check the scope

Review what is included and excluded.

Confirm whether the range covers labour only, supply and installation, removal, preparation, products, waste, specialist trades and final making-good.

03 Compare specification

Match the allowance to your intended finish.

Standard, mid-range and specialist products can produce very different budgets even when the room size and broad construction work appear similar.

04 Allow for the property

Consider access and existing conditions.

Occupation, restricted access, parking, protection, hidden defects, structural discoveries and older building fabric can affect the final scope and programme.

BEFORE COMPARING FIGURES Four details that can change what a price means.
VAT treatment

Check the wording on the individual guide. Some figures are presented excluding VAT, while others may show VAT-inclusive project totals.

Labour or complete project

A labour rate should not be compared directly with a supplied, installed and finished project range.

Product allowances

Cabinets, sanitaryware, tiles, flooring, paint and specialist finishes can materially change the total.

Preparation and repairs

Removal, levelling, plaster repairs, waterproofing and structural preparation may sit outside a basic installation allowance.

Always follow the wording on the individual guide.

Each cost page has its own pricing basis, scope and assumptions. This directory helps you find the correct guide but does not replace the detailed inclusions, exclusions and qualifications stated there.

REAL GROWCHANCE PROJECTS

See what sits behind a renovation budget.

Cost guides provide planning ranges. Project case studies show how the work, property and technical requirements come together in a real London home.

Explore the relevant project for scope, sequencing and completed-work evidence.

PROJECT-SPECIFIC EVIDENCE
A completed project is evidence—not a universal price promise.

Project scope, specification, access, building condition and approvals vary. Any price or programme recorded on a case study applies to that particular project and should not be treated as an automatic quotation for another property.

BUDGET PLANNING QUESTIONS

Before you rely on a renovation cost.

These answers explain how to interpret the guides, calculators and project information across the Growchance website.

01 Are the cost-guide figures fixed quotations?

No. The figures are planning guidance based on the scope and assumptions explained within each guide. A quotation requires confirmation of the property, measurements, specification, access and required work.

02 Do all Growchance cost guides include VAT?

Not necessarily. VAT treatment is stated on the individual guide. Some trade rates are presented excluding VAT, while some complete project examples or ranges may be shown including VAT.

Check the wording beside the relevant figure before comparing it with another price.

03 Which guide should I use for work involving several rooms?

Start with the guide covering the main project. For example, use the Full House Renovation Cost Guide for coordinated work across a house and the Flat Renovation Cost Guide for a flat or apartment.

Specialist guides can then help you understand individual parts of the work without automatically adding every published range together.

04 Why can two similar-size projects have different costs?

Size is only one factor. Specification, removal work, preparation, building condition, structural requirements, access, service alterations, product choices and final finishing can all change the scope and price.

05 What is the difference between a cost guide and a calculator?

A cost guide explains typical ranges, inclusions, exclusions and cost drivers for a type of project. A calculator uses measurements and selected options to produce an initial quantity or planning estimate.

Neither replaces a property-specific assessment and quotation.

06 Can I use a completed project price for my own property?

A project price applies to the recorded property, scope, specification and circumstances. It can provide useful context, but it should not be treated as an automatic quotation for another home.

DISCUSS YOUR RENOVATION

Ready to move from a guide to your property?

Tell Growchance what you are planning, where the property is and what information you already have. We can then consider the appropriate next step for the proposed work.

Property

Include the London postcode and property type.

Project

Describe the rooms, structural work or improvements being considered.

Evidence

Mention any photographs, plans, surveys, designs or measurements already available.

Programme

Explain any preferred timing, access considerations or occupied-property requirements.

Published cost guides and calculator results are planning information. A project-specific price requires confirmation of the actual scope and property conditions.

Request Your Free Site Visit