INTERNAL WALL REMOVAL COST GUIDE · LONDON

Internal Wall Removal Costs in London.

Plan the cost of removing a confirmed non-load-bearing stud, plasterboard, brick or block partition, including normal project waste and appropriate local making good.

Not sure what the wall supports? Do not select a price from appearance alone. Growchance can review the proposed alteration and establish whether it follows the internal-wall or structural route.

All guide figures exclude VAT and are planning ranges rather than quotations. Final scope depends on wall construction, services, access and the finishes affected.

NON-LOAD-BEARING WALLS

2026 WORKING GUIDANCE

Complete-project planning ranges Demolition, normal waste and local making good.
Small stud partition Up to approximately 2 m at standard room height
£540 – £810
Typical stud partition Approximately 2.5–4 m at standard room height
£810 – £1,350
Brick or block partition Confirmed non-load-bearing construction
£1,080 – £2,250
Wall type confirmed first These bands apply only to confirmed non-load-bearing walls.
Usable scope, not demolition only Normal project waste and appropriate local making good are included.
Connected work stays transparent Services, finished flooring and wider decoration are added only when required.

QUICK COST ANSWER

How much does it cost to remove an internal wall in London?

Removing a wall confirmed as non-load-bearing typically costs £540 – £2,250 excluding VAT, depending principally on its construction, length, access and the connected work affected.

Growchance’s principal ranges cover a usable wall-removal scope rather than demolition alone: normal protection, agreed removal waste and appropriate local making good are included.

Small stud partition

Up to approximately 2 m long at standard room height.

£540 – £810 EXCLUDING VAT

Typical stud partition

Approximately 2.5–4 m long at standard room height.

£810 – £1,350 EXCLUDING VAT

Brick or block partition

Masonry positively confirmed as non-load-bearing.

£1,080 – £2,250 EXCLUDING VAT
PRINCIPAL RANGE INCLUDES

A practical removal scope, not a demolition-only headline.

  • Ordinary protection for the agreed work
  • Controlled partition demolition
  • Normal waste generated by the removal
  • Cleanup of the immediate working area
  • Local repair at adjoining wall junctions
  • Local ceiling repair caused by removal
  • Plaster finish ready for later decoration
  • Straightforward door/frame demolition within the wall
A supporting or structural wall follows a different cost route.

Temporary support, structural calculations, steelwork, padstones and structural approvals are not included in the non-load-bearing ranges above.

View Load-Bearing Wall Costs

UNDERSTANDING THE QUOTED SCOPE

What does the standard wall-removal price cover?

The principal Growchance ranges are intended to represent a usable removal package, not an artificially low demolition-only figure.

The quotation still separates work that depends on the property’s services, existing finishes or conditions beyond the immediate wall junction.

STANDARD RANGE

Normally included

  • Protection and preparation

    Ordinary protection and setup appropriate to the agreed wall-removal area.

  • Controlled demolition

    Removal of the confirmed non-load-bearing partition, including its ordinary wall linings and framing or masonry.

  • Normal project waste

    Waste generated by the agreed removal, excluding unrelated rubbish, hazardous materials and exceptional disposal requirements.

  • Local wall and ceiling repairs

    Patching and plaster making good immediately where the partition met adjoining walls and the ceiling.

  • Immediate-area cleanup

    Ordinary cleanup associated with the agreed demolition and local making-good work.

WHERE REQUIRED

Assessed separately

  • Electrical and plumbing alterations

    Sockets, switches, cabling, radiators, pipework and other services affected by the proposed removal.

  • Finished-floor reinstatement

    Matching laminate, timber, LVT, tiles, carpet or another existing floor across the former wall position.

  • New skirting and wider carpentry

    Replacement sections, profile matching, new joinery or door/frame work beyond straightforward demolition within the removed wall.

  • Complete-room finishing

    Painting whole rooms, extensive plastering or decorating beyond the local areas disturbed by removal.

  • Exceptional conditions and logistics

    Hazardous materials, failing backgrounds, difficult access, parking suspensions, permits or unusual disposal volumes.

What does “ready for decoration” mean?

Local plaster repairs are completed around the former wall junction so the affected area can dry and receive subsequent decoration. It does not include painting the adjoining rooms, guaranteeing an invisible match with every existing surface or repairing unrelated pre-existing defects.

STUD AND PLASTERBOARD PARTITIONS

Two useful cost bands for lightweight internal walls.

Stud partitions are generally quicker and lighter to remove than masonry, but the price still depends on length, layers, insulation, services and the repairs left at adjoining surfaces.

The dimensions below are budgeting definitions, not a substitute for measuring and checking the wall.

£540 – £810 EXCLUDING VAT

Small stud partition

A straightforward lightweight partition up to approximately 2 m long at a standard 2.4 m room height.

  • Normal access and working space
  • Ordinary plasterboard and timber or metal studs
  • No significant services requiring alteration
  • Normal waste and local making good included
  • Typically 1–2 working days
£810 – £1,350 EXCLUDING VAT

Typical full stud partition

Removal of an entire uncomplicated lightweight partition, approximately 2.5–4 m long at standard room height.

  • Larger protection and demolition area
  • More plasterboard, framing and disposal volume
  • Longer ceiling and adjoining-wall junctions
  • Normal waste and local making good included
  • Typically 1–3 working days
WHERE THE PRICE MOVES

What places a stud wall toward the upper end?

Multiple board layers

Extra plasterboard, acoustic board, tile backing or dense linings increase removal and disposal.

Insulation and complex framing

Acoustic or thermal infill, closely spaced studs and reinforced fixing zones take longer to dismantle.

Services within the wall

Sockets, switches, cabling, pipework and radiators require appropriate isolation and alteration.

Fragile adjoining finishes

Older plaster, cornices, tiles or surfaces that cannot be matched locally may require a wider repair scope.

MASONRY PARTITION STATUS CONFIRMED FIRST
GROWCHANCE WORKING RANGE £1,080 – £2,250
EXCLUDING VAT

BRICK AND BLOCK PARTITIONS

Why does a masonry partition cost more to remove?

A confirmed non-load-bearing brick or block partition involves more weight, dust, rubble and manual handling than a lightweight stud wall. The surrounding floor, ceiling and wall junctions may also need more substantial local repair.

01 Heavier demolition

Masonry is slower to dismantle in a controlled way and creates denser material for removal.

02 Greater protection

Dust and impact require careful protection of adjoining rooms, surfaces and access routes.

03 More disposal volume

Brick, block and plaster create heavier loads and may require a different waste arrangement.

04 Wider local repair

Junctions and the former wall footprint may need deeper filling, patching or substrate work.

“Non-load-bearing” does not mean “remove without checking”.

A masonry partition must be positively confirmed as non-structural. Its fire-separation, acoustic, service or leasehold function may still affect the proposed work and quotation.

MAKING GOOD AFTER REMOVAL

Local repair is included. Wider finishing is a separate scope.

Our standard wall-removal bands include the repairs caused directly by taking out the agreed partition. They do not assume complete redecoration, widespread plastering or finished-floor replacement across both rooms.

DIRECTLY AFFECTED AREA LOCAL REPAIR SCOPE

Included in the standard wall-removal range

Repairs are confined to the surfaces disturbed by the agreed demolition.

  • Former wall junction Local plaster making good where the partition met adjoining walls.
  • Ceiling connection Local repair to the strip or junction exposed by removing the wall.
  • Removal damage Reasonable local patching caused directly by the controlled demolition.
  • Ready for later decoration A repaired local surface prepared for subsequent painting once suitably dry.

Quoted separately where required

These items depend on the existing finishes, the intended final appearance and the wider room scope.

  • Finished-floor reinstatement Matching timber, tiles, vinyl, carpet or another finish across the former wall line.
  • Whole-room decoration Painting complete walls, ceilings or both adjoining rooms for a uniform finish.
  • Widespread plaster work Skimming larger surfaces or correcting unrelated cracks and defective existing plaster.
  • Skirting and decorative details New or replacement skirting, cornices, trims and product-specific finishing.
“Ready for decoration” is not the same as fully decorated.

Fresh plaster must dry before paint is applied. Final colour matching, full-room preparation and decoration are included only where they appear in the agreed quotation.

CONDITIONAL PROJECT COSTS

Add only the work the wall actually affects.

Internal walls may contain electrical wiring, pipework or heating services. Their removal can also leave door, skirting and floor details that require separate work.

The allowances below are used only when the item is genuinely affected and included in the agreed quotation.

01

Local electrical alteration

For a typical affected socket, switch or electrical point where a straightforward local alteration is possible. Complex rewiring, testing requirements or consumer-unit work is assessed separately.

£105 – £225 PER AFFECTED POINT
EXCLUDING VAT
02

Radiator relocation

For a straightforward relocation where the existing heating system, pipe route and proposed new position are suitable. The radiator product and extensive pipe alterations may be separate.

£225 – £450 WHERE APPLICABLE
EXCLUDING VAT
03

Separate door and frame removal

A simple door and frame contained within the partition being removed is normally included. This allowance applies only where door or frame removal is genuinely additional to the main wall scope.

£90 – £180 ADDITIONAL REMOVAL
EXCLUDING VAT
04

New or replacement skirting

Labour guidance for straightforward skirting installation where the altered room layout requires new lengths. Skirting products, complex profiles, preparation and painting are separate where applicable.

£10 – £16 PER LINEAR METRE LABOUR
EXCLUDING VAT
05

Other plumbing or waste services

Water supplies, waste pipes and other plumbing routes vary by position, accessibility and the new room layout. The appropriate alteration is defined after inspection of the affected service.

Assessed separately PROJECT-SPECIFIC SCOPE
06

Gas service alterations

Suspected or confirmed gas pipework requires an appropriate separate route. Gas work must be completed by a suitably qualified Gas Safe registered engineer and is not covered by a general wall allowance.

Assessed separately QUALIFIED GAS WORK
ALREADY WITHIN THE MAIN BAND

Do not charge twice for the same work.

Straightforward demolition of a door and frame that forms part of the partition being removed is already included in the standard wall band.

Normal waste, controlled demolition, cleanup and local making good are also included under the assumptions stated earlier. A separate allowance is added only when the quotation includes a genuinely additional task.

These allowances are not a menu to add automatically.

The final scope depends on what is found within and around the wall, which services must remain operational and what finish is required after the rooms are joined.

WASTE AND SITE LOGISTICS

Normal removal waste is included. Exceptional logistics are not.

The published wall-removal bands assume an ordinary London residential property with a workable route between the wall and the collection point.

Normal waste generated by the agreed removal is included. Separate costs arise only where the property, material or external restrictions create an exceptional requirement.

STANDARD ASSUMPTION
Protection, removal, cleanup and normal waste.

These core activities form part of the relevant small stud, typical stud or confirmed masonry wall-removal range.

01 Ordinary access

A practical route through the property without exceptional carrying distances, restricted hours or specialist lifting.

02 Normal project waste

Plasterboard, timber, masonry or finishes generated directly by the agreed wall removal.

03 Reasonable protection

Protection appropriate to the work area and the normal access route used during the project.

04 End-of-work cleanup

Removal of demolition debris and ordinary cleanup of the directly affected working area.

01 Restricted access

Long carrying routes, narrow communal areas, upper floors without suitable access or restricted working periods.

02 Parking controls

Paid parking, parking suspensions, road restrictions or other arrangements required specifically for the work.

03 Unrelated waste

Existing rubbish, materials from other contractors or disposal outside the agreed wall-removal scope.

04 Exceptional volume

Unusually heavy or extensive demolition material requiring additional handling, labour or disposal arrangements.

Hazardous or suspect material is never treated as ordinary waste.

Where asbestos or another hazardous material may be present, work must follow the appropriate assessment, handling and disposal route. That work is not included in the standard internal-wall removal ranges.

ILLUSTRATIVE BUDGETS

How the guide rates combine in different situations.

These examples show how the approved working ranges may be applied to clearly defined scopes. They are budget illustrations, not completed-project claims or quotations.

Only genuinely affected services have been added. Finished-floor work, wider decoration and other separate items are not assumed.

01

Small uncomplicated stud partition

Up to approximately 2 m long at standard room height, with ordinary access and no service alterations.

  • Wall removal, protection and cleanup Included
  • Normal project waste Included
  • Local making good Included
  • Electrical or plumbing alterations Not required
ILLUSTRATIVE RANGE £540 – £810 Excluding VAT
02

Typical stud wall with one electrical point

A full lightweight partition approximately 2.5–4 m long, plus one straightforward affected electrical point.

  • Typical full stud partition £810 – £1,350
  • One local electrical alteration £105 – £225
  • Normal waste and local repair Included
  • Finished-floor reinstatement Separate
COMBINED ILLUSTRATIVE RANGE £915 – £1,575 Excluding VAT
03

Masonry partition with radiator relocation

A brick or block partition confirmed as non-load-bearing, with one straightforward radiator relocation included.

  • Confirmed non-load-bearing masonry wall £1,080 – £2,250
  • Radiator relocation allowance £225 – £450
  • Normal waste and local repair Included
  • Wider plastering or decoration Separate
COMBINED ILLUSTRATIVE RANGE £1,305 – £2,700 Excluding VAT
HOW TO READ THESE EXAMPLES

The lowest figure is not automatically the likely final price.

The wall band comes first

Selecting the relevant stud or confirmed masonry band establishes the main removal scope and its included work.

Then add only verified requirements

Services, skirting, floors and wider finishing are considered only when inspection confirms they are affected.

Every example assumes the wall has already been confirmed as non-load-bearing.

If its structural status is uncertain, the project moves to the assessment route first. A supporting wall is outside this cost guide and follows the separate load-bearing wall process.

WHAT AFFECTS THE PRICE?

Why two similar-looking walls can produce different quotations.

The visible length of a wall is only one part of the calculation. Construction, services, adjoining finishes and the working environment determine the labour and repair scope.

A reliable quotation is based on the wall, the property and the intended finished result together.

POSITION WITHIN THE GUIDE RANGE Complexity moves the project—not one feature alone.
LOWER END Straightforward
MIDDLE Additional detail
UPPER END Several constraints

The upper end is not a surcharge. It reflects a larger, heavier or more involved version of the agreed work within that wall category.

01

Wall construction

Stud framing, board layers, insulation, brick and block require different demolition, handling and disposal methods.

02

Length and height

A longer or unusually high partition increases protection, material volume, working time and the junctions requiring repair.

03

Services in the wall

Electrical points, pipework, waste services and heating routes may require isolation, rerouting and specialist attendance.

04

Adjoining finishes

Tiles, cornices, older plaster, panelling and finishes that cannot be matched locally can increase the repair scope.

05

Finished-floor gap

The former wall line may reveal missing or mismatched flooring that requires a separate reinstatement solution.

06

Access and protection

Long carrying routes, occupied homes, communal areas and delicate nearby finishes can require additional time and control.

07

Property requirements

Leasehold conditions, management rules, permitted hours, fire separation or acoustic needs may affect the proposed method.

08

Required final finish

Local making good differs from complete-room plastering, decorating, trim replacement and a seamless flooring finish.

LIKELY LOWER-END CONDITIONS

Clear scope and uncomplicated surroundings.

A straightforward wall, normal access, no affected services and local repairs that can be completed without extending into wider room finishes.

LIKELY UPPER-END CONDITIONS

Heavier work or several connected requirements.

A larger or masonry partition, service alterations, sensitive existing finishes, access restrictions or more involved local repair and protection.

CHOOSE THE CORRECT WALL ROUTE

This cost guide starts only after the wall type is confirmed.

A wall can look lightweight, solid or simple without its structural role being obvious. Construction alone does not provide enough certainty to remove it safely.

Use the route that matches the evidence available—not the route with the most convenient price.

01 NON-LOAD-BEARING
CONFIRMED

Use this internal wall cost guide.

The partition has been appropriately confirmed as non-structural and the proposed scope falls within the stud or masonry categories explained on this page.

  • Stud and plasterboard partitions
  • Confirmed non-structural brick or block walls
  • Local making good and conditional service alterations
Explore Internal Wall Removal
02 WALL STATUS
UNCERTAIN

Assessment comes before pricing.

If the wall has not been positively identified, do not select a price band from its thickness, sound or surface finish alone.

  • Review the building and proposed opening
  • Check available drawings and surrounding construction
  • Obtain further professional input where required
Read the Wall Assessment Guide
03 LOAD-BEARING OR
STRUCTURAL

Use the structural wall route.

A supporting wall involves a different process and cost basis, potentially including structural design, temporary support, steelwork and Building Control requirements.

  • Structural engineer’s design where required
  • Temporary support and structural installation
  • Separate structural wall cost guidance
Explore Load-Bearing Wall Removal
Do not transfer the prices on this page to a structural wall.

The separate Load-Bearing Wall Removal Cost Guide owns structural-wall pricing, including the relevant engineering, support and structural installation considerations.

View Structural Wall Costs  ↗

CHECKS BEFORE WORK STARTS

Non-load-bearing does not mean permission-free.

An internal wall may perform functions beyond carrying structural loads. Its removal can affect fire separation, escape arrangements, sound insulation, services or the approved layout of a leasehold property.

The checks required depend on the property, wall and proposed layout. They should be resolved before demolition begins.

SENSIBLE PROJECT ORDER

Confirm first. Obtain consent. Then programme the work.

  1. Establish the wall’s role and construction.
  2. Confirm the approvals and property consents required.
  3. Define the removal, services and finishing scope.

Do not rely on appearance alone. A thin, hollow-sounding or apparently simple partition may still require investigation before removal.

01 WALL STATUS

Confirm that the wall is non-load-bearing

Review the wall in the context of the floors, roof, adjoining structure and any available drawings. Seek suitable professional input where the role remains uncertain.

02 BUILDING REGULATIONS

Check whether Building Control approval applies

Building Regulations will normally apply to creating, removing or opening an internal wall. The relevant requirements depend on the wall’s functions and the resulting layout.

03 LEASEHOLD PROPERTY

Read the lease and obtain written consent

A lease may require landlord or freeholder consent for layout changes, including a non-structural wall. That consent is separate from planning and Building Control decisions.

04 PROPERTY STATUS

Check planning and protected-building constraints

Planning permission is a separate question. Listed status, planning conditions, a change of use or other property-specific controls may affect an internal alteration.

05 SAFETY AND LAYOUT

Preserve fire, escape and acoustic performance

Removing a partition can change room relationships and protected routes. The resulting layout must be considered rather than judging the wall only by whether it carries weight.

06 BUILDING SERVICES

Identify electrical, plumbing and gas services

Services must be located, isolated and altered appropriately. Specialist work, testing and certification are defined according to what the wall contains.

Ownership and lease terms must be checked for the individual property.

Government leasehold guidance confirms that the lease sets out whether permission is needed for alterations. Landlords and freeholders may also impose their own application, drawing, professional-report or licence requirements.

TYPICAL WORKING PROGRAMME

Removal can be quick. A finished result takes longer.

The working ranges below cover the active project scope under normal conditions. The programme changes when services, access, permissions or more substantial repairs are involved.

Working days are not always consecutive calendar days. Drying, inspections, specialist attendance and later decoration can extend the elapsed time.

01

Small stud partition

A straightforward lightweight wall with normal access, no significant services and local making good.

TYPICAL ACTIVE PROGRAMME 1 – 2 WORKING DAYS
02

Typical full stud partition

A complete uncomplicated partition approximately 2.5 – 4 m long at standard room height.

TYPICAL ACTIVE PROGRAMME 1 – 3 WORKING DAYS
03

Non-load-bearing masonry wall

A brick or block partition already confirmed as non-structural, with normal disposal and local repairs.

TYPICAL ACTIVE PROGRAMME 2 – 4 WORKING DAYS
04

Several services or substantial finishing

A wall involving multiple alterations, wider protection or a more extensive agreed repair scope.

TYPICAL ACTIVE PROGRAMME 3 – 5 WORKING DAYS
FROM DEMOLITION TO DECORATION

The wall can disappear before the room is ready to paint.

A practical programme separates controlled removal, building-service work, making good and the natural drying period of fresh plaster or repair materials.

01 Protect and isolate

Prepare the work area and deal appropriately with affected services before demolition.

02 Remove and clear

Dismantle the agreed partition in a controlled way and remove the resulting project waste.

03 Make good

Repair the directly affected ceiling and adjoining-wall junctions included in the agreed scope.

04 Allow to dry

Fresh plaster and repair materials must dry suitably before subsequent preparation and decoration.

Drying time is site-dependent and is not included as a working day.

Ventilation, temperature, repair depth, background material and the products used affect when decoration can begin. The completed repair should be checked rather than painted to an assumed calendar date.

FROM GUIDE PRICE TO QUOTATION

A quotation starts with the actual wall—not a generic rate.

The guide bands provide an initial budgeting framework. A quotation defines the measured wall, included protection, demolition, waste, service alterations, making good and any separate finishing work.

This prevents included work and conditional allowances from being counted twice.

01

Send the initial details

Explain which wall you want to remove, the intended room layout and what is already known about the wall.

ENQUIRY REVIEW
02

Share useful photographs

Provide clear images of both sides of the wall, its junctions, nearby doors, radiators, sockets and the access route.

INITIAL SCOPE
03

Confirm the assessment route

Where appropriate after the enquiry review, an initial site assessment can be arranged to clarify the wall and project conditions.

WHERE APPROPRIATE
04

Define the complete scope

Identify affected services, local repairs, waste arrangements and any separate flooring, skirting or decorating work.

MEASURED REQUIREMENTS
05

Issue the quotation

Present the agreed work, assumptions, exclusions, programme guidance and price basis for review before scheduling.

WRITTEN PROJECT BASIS
WHAT HELPS US REVIEW THE PROJECT?

Good information produces a clearer first response.

You do not need to diagnose the wall yourself. Describe what you want to achieve and provide the information already available.

Wall dimensions

Approximate length, height and thickness help identify the likely scale while the project is being reviewed.

Both sides of the wall

Images should show the complete wall, ceiling junction, floor line and its relationship with adjoining rooms.

Visible services

Include sockets, switches, radiators, pipework, controls and any other visible fitting connected with the wall.

Property information

Tell us whether the property is freehold or leasehold and share relevant drawings, reports or permissions already obtained.

The initial assessment is free where appropriate after enquiry review.

Submitting an enquiry does not automatically guarantee a site visit. We first review the location, proposed work and available information so that the correct next step can be recommended.

NO AUTOMATIC SITE-VISIT PROMISE

CONNECTED SERVICES AND GUIDANCE

Choose the next page by the question you need answered.

This page owns budgeting guidance for walls already confirmed as non-load-bearing. The links below cover contractor services, structural-wall costs, wall assessment and regulatory context.

Keeping each question with its correct page provides a clearer route for planning the work.

01 CONTRACTOR SERVICE

Internal Wall Removal

Explore the Growchance service for removing confirmed non-load-bearing partitions and making good the directly affected areas.

View the Service
02 STRUCTURAL SERVICE

Load-Bearing Wall Removal

Use the structural service route where the wall supports part of the building or the proposed opening requires structural work.

View the Structural Service
03 STRUCTURAL COST GUIDE

Load-Bearing Wall Removal Costs

Review the separate cost framework for structural walls, including the different professional and construction requirements involved.

View Structural Wall Costs
04 ASSESSMENT GUIDE

Assessing Structural Walls

Understand why visual clues are not enough and when the wall’s structural role needs further professional confirmation.

Read the Assessment Guide
05 REGULATIONS GUIDE

Wall Removal Regulations UK

Review the broader Building Regulations, planning, leasehold and property-consent questions connected with wall alterations.

Read the Regulations Guide
06 COST-GUIDE DIRECTORY

London Renovation Budget Planning

Browse connected Growchance cost guides for structural work, finishing trades, flooring, kitchens, bathrooms and other renovation scopes.

Explore All Cost Guides

COST QUESTIONS

Useful answers before an internal wall is removed.

These answers apply to walls confirmed as non-load-bearing. Structural or uncertain walls follow a different assessment and pricing route.

Discuss Your Wall Project
01 How much does it cost to remove a non-load-bearing wall in London?

Growchance working guidance is £540 – £810 excluding VAT for a small stud partition up to approximately 2 m long, £810 – £1,350 excluding VAT for a typical full stud partition approximately 2.5–4 m long, and £1,080 – £2,250 excluding VAT for a brick or block partition confirmed as non-load-bearing.

The applicable range depends on construction, dimensions, access, services and the repairs required after removal.

02 What does the standard wall-removal price include?

The standard bands assume ordinary access and include appropriate protection, controlled demolition, normal waste generated by the agreed removal, cleanup and local making good where the partition met the ceiling and adjoining walls.

Local making good means the directly affected repair is left ready for subsequent decoration. It does not mean complete-room plastering or painting.

03 When does the £450 minimum project charge apply?

The £450 minimum charge excluding VAT is for unusually small or partial work where an ordinary wall-removal band is unsuitable. It is not the headline price for removing a complete small partition. A typical small stud-partition range begins at £540 excluding VAT.

04 How do I know whether the wall is non-load-bearing?

Do not determine the wall’s role from its thickness, surface material or sound alone. It should be considered in relation to the surrounding structure, floors, roof and any available drawings.

If its role is uncertain, use the structural-wall assessment guidance before applying the prices on this page.

05 Do Building Regulations apply to a non-load-bearing wall?

Building Regulations will normally apply when an internal wall is built, removed or opened. A non-load-bearing wall may still affect fire separation, escape arrangements, sound insulation, ventilation, services or the resulting room layout.

Read the Wall Removal Regulations Guide and confirm the property-specific requirements before work begins.

06 Is the gap in the finished floor included?

No. Finished-floor reinstatement or matching is separate because the correct solution depends on the existing material, direction, pattern, product availability and the intended finish across the joined rooms.

The quotation can include an agreed flooring solution where the necessary information and matching product are available.

07 Can electrical points, pipework or a radiator be moved?

Yes, where the alteration is practical and included in the agreed scope. Typical guidance is £105 – £225 excluding VAT per affected electrical point and £225 – £450 excluding VAT for a straightforward radiator relocation.

Other plumbing, waste, heating or gas services are assessed separately. These allowances are not added unless the service is genuinely affected.

08 How long does internal wall removal take?

A small stud partition typically requires 1–2 working days, a typical full stud partition 1–3 working days, and a confirmed non-load-bearing masonry partition 2–4 working days. Work involving several services or substantial finishing may require 3–5 working days.

Plaster drying and subsequent decoration are additional. Working days are not necessarily consecutive calendar days.

DISCUSS YOUR INTERNAL WALL PROJECT

Tell us which wall you want to remove.

Share the property location, approximate wall dimensions and the room layout you want to create. Growchance will review the initial information and contact you to discuss the appropriate next step.

Wall details

Approximate length, height and thickness, wall construction if known, and which rooms it separates.

Useful photos

Include both sides of the wall, ceiling and floor junctions, doors, sockets, radiators and the access route.

Available records

Mention any drawings, wall assessment, structural information, Building Control advice or leasehold consent already available.

The initial assessment is free where appropriate after enquiry review. Submitting an enquiry does not create a quotation or contract, confirm wall status, guarantee a site visit or reserve availability.

Request Your Free Site Visit